cancel
Showing results for 
Search instead for 
Did you mean: 

Multiple inspection plan for a materials

Former Member
0 Kudos

Hello

We have multiple inspection plan . if we have more than two how to select the priority and the selection criteria.Any advice will be highly appreciated

Thanks

JJ

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

If there are 2 inspection plans for the same material, use the T-code QA02 and assign the relevant inspection plan ( system displays the available inspn plans out of which you can select the required one).

regards

Selva

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi JJ

If You are using Multiple Inspection plan then You can alwaz catagerise them depending upon the Material assignment.(In Inspection plan header)

Suppose you have Inspection plan with Group X for a specific vendor or Customer or plant

Then for same material you can have GroupY for a differnrt vendor or Customer or Plant.

When Inspection lot is created corrosponding IP will get attached.

or

what you can mension is Different status of Inspection plan in Header.

or

you can mension is Different Usage of Inspection plan in Header.

Regards

Sujit

Former Member
0 Kudos

Hi JJ,

An inspection plan is uniquely identified by task list group and group counter.The system uses material, usage code, plan status and lot size to automatically select inspection plan.

You can create IP for different usage code, plan status and lot size ( for example model,inspection,prelimnary Inspection,goods issue inspection, from lot size X to lot size y, etc) for a material. In the QM view of MM, in Inspection type; we define for which task list usage, this material is to be linked with.

If there are 2 inspection Plan for same usage code, plan status and lot size; Inspection plan can not be assigned automatically.It is to be assigned manually; in this case after creation of Inspection Lot.

Let me know if more information is required on this.

Thanks,

RAVI.