cancel
Showing results for 
Search instead for 
Did you mean: 

How to restrict UD reversal after Stock Posting

Former Member
0 Kudos

Hi All,

Scenario is Incoming inspection. After the results recorded, UD is given and the stock posting is done. After saving the UD, I am able to change the final UD code (say, from ACC to REJ). Is it correct as per standard SAP. If so how to restrict the reversal of UD codes after the UD is done once.

Regards

Sam

Accepted Solutions (1)

Accepted Solutions (1)

former_member186399
Active Contributor
0 Kudos

Dear Sam

it is a standard procedure of changing of UD codes. There are some scenarios like sometimes the material inspected while incomming can be rejected later in the floor. so inorder to reflected this rejection in the quality score and vendor evaluation changing of UD code is done.

If you want to retrict this you can make use of this exit -

QEVA0010 UD: Usage decision check

Regards

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Sam,

If you need to prohibit the change in the UD you may go with the Gajesh's Suggestion. it is absolutely bingo.

But you can prohibit certain user by withdrawing rights for the t code QA12.

Regards,

Shyamal.