on 04-30-2009 6:43 PM
Hello -
In a Stock Transfer Order scenario, how can we get the Supplying Plant transferred from the STO or Inbound Delivery to GTS so that we can use it as a partner on the Import Customs Declaration? I am not sure how the plant must be listed in the ECC documents in order for it to appear on the Import Customs Declaration as a Partner Function...
Thanks in advance.
Hi ,
This we can achieve by configuring the Partner function for the Particular STO type.
In SPRO ( ECC ) path for the configuration :
Materials Mgmt--àPurchasing-àPartner Determination-àPartner settings in Purchasing documents.
1. First we would be require the define the Partner schema which will decide what all partner can be
available on the STO doc.
To a particular schema your Delivery Palnt can be added which can have shown as partner on the
STO doc, And same partner will be pushed to GTS ( once configured in GTS accordingly ) for
screening .
2. Now this schema has to be assigned to STO doc type:
3. Configured the required on GTS side for respective partner for SPL screening.
Hope this helps.
Kind Regards,
Sameer
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sameer -
Thanks for the helpful feedback. I looked in SPRO and found the Partner Schema 0003 for STOs, which contains the DP (Delivering Plant) Partner Function. I assigned this to the STO type UB, however in the Partner tab of the STO, I cannot maintain any entries for DP - there are none to choose from in the dropdown and any that I enter are not saved.
I assume that the Delivering Plant here is meant to represent the "Supplying Plant" at header level? How come I am unable to maintain this in the Partner tab?
Thanks again.
Hi ,
If you have defined DP in the schema it should come in drop down, may be when u try to add the supplying plant detail it is not allowing u to save.
as what ever partner you try assign here has to be defined as Vendor and the partner for eg DP it has got permissible account group assigned or not
which u assign under Partner Determiantion -Partner Role- "Define Permissible Partner Roles per Account Group".
Which ever permissible account grp u define for a partner fucntion you can assign a vendor of that account group only.
kind regards,
Sameer
Hi Sameer. I ran into an issue with STO today and came to same conclusion to configure DP to assign to my STO doc type. However, when I assign DP partner role, the system says only partner roles with "LI" (Vendor) can be used. We have DP assigned as a plant (since it is a plant). I went to SCN and found this thread which affirms the configuration I am doing is correct. Do you have DP assigned as a LI? I can change the Partner Role definition to make it LI instead of WK, but I wanted to verify that is the only way to fix this.
Here is the error message I am getting when I assign DP Partner Function to Partner Schema.
User | Count |
---|---|
13 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.