on 04-29-2009 5:28 PM
Hi!
I successfully installed SAP system via system copy with SAPINST.
Which reports, tcodes, etc. should I run as post installation steps?
(Especially for planing/scheduling of jobs, change of logical system names, delete/truncate old DB table entires)?
Thank you very much!
regards
Jürgen
Hi
Tcode SE38-->BTCTRANS1 and BTCTRANC2
Regards
Uday
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
you have to perform all the post installation steps mentioned in system copy guide.
System Copy for SAP Systems Based on NW 7.0 SR3 ABAP or ABAP+JAVA.PDF
service.sap.com/instguides
Regards,
Debasis.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Also refer to system copy guides on market place
Rohit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Please find the list of steps you should be following after doing the system copy and starting SAP.
1. "Reschedule status of all Active,released and ready jobs to Scheduled status"
2. Install SAP license
3.RZ10 - Delete old profiles and re-import new ones.
4.Configure WorkBench Organizer with Option Database Copy (SE06)
5.Configure TMS
6.Import Users & Profiles
7.Lock all users except Basis and system id's and assign SAP_ALL and SAP_NEW to basis id's
8.Logical systems Rename(BDLS)
9.Check table RSBKDTP and look for any entries pointing to Production system
10.Reschedule the Jobs - Only Standard SAP
11.Clean up batch jobs
12.Clean up Temse and spool
13.Clean out failed updates
14.Clean out inbound and outbound queues
15.Cleanup job and BDC logs on Filesystem
16.Check SAP Consistency check SM28
17.Cleaning of Target System Tables-Goto SE14 and delete the entries from the tables:
ALCONSEG, ALSYSTEMS, DBSNP, MONI, OSMON, PAHI,
SDBAD, SDBAH, SDBAP, SDBAR
18.Delete all entries from tables TPFET and TPFHT
19.Reconfigure Operation Modes
20.Reconfigure directoires AL11.
21.RE-Configure Emails from SCOT
22.Delete and Import Output Devices
23.Reset SSO Tickets by STRUSTSSO2 and Import new certificates.
24.Clear the queues through SMQ1 and SMQ2
25.Adopt original Client settings
26.Check Scheduler for Inbound & Outound
Let me know of any questions
Rohit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I would better suggest not to use the reports:
1. Go to SM37,put job name as *,user name as *,select the status as scheduled,released,ready and select the time period from last month to next 1 month and execute
Now all the jobs willl come,select all the jobs in sm37 screen,go to Jobs and change the status to schedule,it will be ok
after that select the status as active and cancel all the jobs
2. Dont reschedule standard SAP jobs,just go to SM36 and schedule all the standard SAP jobs
Rohit
After making a copy of PRD back to supporting systems (QA, etc.) the production servers are still listed in ST03n, even after deleting the contents of the tables listed in the system copy guide (MONI, OSMON, ALSYSTEMS, etc.). Where is this information stored in NW04s (ECC 6) and can it be cleared from SE14 just after a system copy? Is it just in the SAPWLSERV? If I remove all tables, will the current system (QA) servers be added back after running the performance collector?
Thank you in advance.
User | Count |
---|---|
87 | |
10 | |
10 | |
10 | |
7 | |
6 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.