1. Can you simply advise us how to define the MRP traffic lights (say we want indication if the material is available for 45 days or less).

2. What are the settings required for this in MM01/02.

3. Why the materials is showing in MD04 if that is available. (Can we prevent in showing in MD04 if the material is available).