I am not able to calculate material overhead after running Overhead calculation KGI2 Its not update in the production order cost analysis view.
I have thoroughly checked the cost sheet, overhead base, rate, credit, percentage, etc..
My plan and target cost overhead on material is coming as per the cost sheet.. but actual overhead on material alone is not coming..
How to do this, After calculating the Actual OH from ( KGI2) does it appear in the order?
Could some one help me out.
Kesh
Does your order has already been issued with material that attracts the overhead (I mean has the same cost element, which is the base for overhead?)
Have you removed the test run checkbox? Enable the Dialog display to see analyze what's happening.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.