Dear All,

In my organization already have two plants now we create new two plants.

my requirement is material copied from previous plant to new plant with all views.

approximately material code is 79000 please guide me.

Thanks

Shital

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

You have to extend all material for new plants.

Doing one by one is not at all solution.I will suggest you to go for LSMW or BDC.

If required take help from Technical team.

Answers (4)

Answers (4)

pardeep_malik
Active Contributor
0 Kudos

Hi,

Try MASS MAINTENANCE

http://www.sap123.com/showthread.php?t=158

or USE LSMW

Regards,

Pardeep Malik

former_member1283268
Participant
0 Kudos

Hey Shital

Seeing the volume of material which you need to extend to two plants LSMW would be a wise option.

Former Member
0 Kudos

Hi,

The Mass Extension of Views for a plant can be done by using MM50.

or else we can Write a LSMW recording where in we can extend the Material taking the same mateial as reference

In MM01,we have option WRT .so using the same ,we have to capture it in the recording and then we can extend the same material to the remaing plants.

Regards

Anjanna.

Former Member
0 Kudos

Hi Shetal,

You can extend material from one plant to other plant with MM01 t-code.

Enter MM01 t-code, Enter material code in Copy from field and material code filed.

Then press enter, Select view.

Enter plant and storage location in Copy from(From which you want to copy material)

Enter Org. level plant and storage location data fro where you want to

copy material.

Then just click on all view and save.

Regards,

Nani.