Hi All,
what is the necessity of the component backflush and the actitivity backflush,
anyway we do all that in the assembly backflush.
in assembly backflush , system do backflush the activity and the component.
then what is the necessity to do above two separately.
thanks in advance
vbakyaraj
Hope this helps..
1. Assembly backflush - GR(131) & GI(261) & activities will get posted (If in REM profile check box for
post activities is included means) and a material document will be generated.This is the normal
backflush used for production confirmation.
2. Component backflush - Only 261 movement for the component's will be taking place and a material
document will be generated and no GR or no activities will be posted.This will be used for posting extra
consumption of component's than the planned one.
3.Activity B/F:
Using the activity backflush in Repetitive Manufacturing, you can backflush activities separately, that is, independently of the goods receipts..By choosing Activity scrap, you can switch from the excess activity consumption to the activity scrap. A separate movement type is provided for the scrap backflush. This means you can also define a separate cost element in Controlling.
And refer this link ...[http://help.sap.com/saphelp_47x200/helpdata/en/12/db1289c30311d1b59b0000e82d81c3/frameset.htm]
karthick
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.