on 04-24-2009 8:26 PM
Dear friends
How to do stability study using QM. Is it done through notifications.
During stability studies are we monitoring the product over a time range or by doing some tests. How is the stablity of a product studied in QM. Pls explain.
Kind regards
Selva
Hi Selva,
One more link for details on STABILITY STUDY and how it is done in SAP
[STABILITY STUDY IN QM|http://help.sap.com/bp_pharmav1600/Pharma_DE/Documentation/P56_BPP_EN_DE.doc]
Thanks,
RAVI.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi freinds
I m also new to stabiltu study. i have go thorugh the post and read the article . i have done everthing. But i m no able to make the inspection plan for storage condtion .
Can anybody how to create the inspecttion plan for storage conditions.? Because i m getting error that testing scheude cannot be completed as no taslkist is assigned to maintenance item 202..?
Please help me out/
Thanks in advance.
Manish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear RKM
Thanks a lot for the details.
regards
Selva
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear RKM
A notification can be created after lot creation. But is it the starting point in stablity study to create a notification first (because the SS notification has only tasks and activities).
Shall I have a small example and some more details on how the stabllity study is monitored with the possible t-codes and mandatory entries for these t-codes please.
regards
Selva
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Selva,
The Question while doing a SS is to test whether Material has the required shelf life to considered fit for use.With this is view, SS carries out in stages as detailed in the above thread.
For Example, let us say we sample of a Mat A send for testing in Lab.
1.Create SS
We need to start the Process of SS in SAP with the Initial Sample received.We do this by creating Q.Notif. type QS ( with Material) or QR (w/o Material).
2.Initial Test
We have to carry out Initial test on the sample before we accept that we can take this forward for testing in future for Shelf Life Study.
Initial Test would be like some test on charcteristic of Mat. A that would assure that the Material is actually Okay wrt what it is expected to be initially.
3.Stabilty Planning
Stability Planning defines future dates in which the Mat A needs to be tested in.It also defines the Storage condition in which the samples would be stored as per the test condition.What dates the Test will be carried out in future.
4.Stabilty Test
On all those dates as planned in future the Inspection Lot would be created automatically and we would need to record result and take UD to record if the tests are okay or not.
5.Complete Stabilty Test
After all those test dates are over, we need to clear the samples and close the SS.
A notification can be created after lot creation.
No.It can be creted w/o creating a lot.
Remember SS is a diffeternt approach than conventional Inspection Planning. It is integrated with Qual. Notification to assist in the Process.
how the stabllity study is monitored with the possible t-codes and mandatory entries for these t-codes please.
It is fairly simple as once you create the Notification as detailed in Step 1, Action Box on the RHS would guide you on further steps.You need not worry about T codes here.Just create a Notification and it will guide you further.
Further read on the Stability Study -
[STABILITY STUDY|http://help.sap.com/saphelp_erp2005/helpdata/en/d2/7c9c3b566ac466e10000000a114084/frameset.htm]
Try it out once
Thanks,
RAVI.
Dear RKM
Thanks for your guidance. Will revert back in case of any clarifications needed.
regards
Selva
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Selva,
You can initial SS by creating Q.Notif. type QS ( with Material) or QR (w/o Material). Once you create a Qualty Notification, the Action Box guides you to the next step, so it is pretty simple
-
Various steps involved in SS are:
1.Create SS
Create Initial Sample
Confirm Initial Sample
Assign stabilty BOM
2.Initial Test
Create inspection lot for initial sample
Perform initial Test
Complet Initial Test
3.Stabilty Planning
Define Storage condition
Store stabilty sample
Create testing schedule
Change Testing Schedule
Complte testing svhedule
4.Stabilty Test
Start Date for Stbilty Test
Schedule stabilty test
Execute Stabilty Test
5.Complete Stabilty Test
-
All steps are trigerred by Follow up action in the Notification and is almost self explanatory.
Do get back in case of any problem.
Cheers,
RKM.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.