SAP for Utilities Discussions
Connect with fellow SAP users to share best practices, troubleshoot challenges, and collaborate on building a sustainable energy future. Join the discussion.
cancel
Showing results for 
Search instead for 
Did you mean: 

Device Management Configuration tips--part 2

Former Member
0 Kudos

Please help me knowing these things in the real time scenario in DM implementation

1)What are the possible changes required for device info record(billing specific)?how it works?

2)Do we configure static notes for the meter reading order? What r the notes in real time scenario?

3)How to Scheduled mass maeter reading order jobs in the back grouond? What is the TCode for each job? 4)Do we monitor these jobs in SM37? for Utility also? what r the different possible variants?

5)How to upload the periodic meter readings? What are issues we face in realtime?

6)How to generate report on implausable meter reading results by portions/MR Units/Period)?

7)How and why we need to configure validation process for the meter reading( plausible/implausible) and what would be the values?

8)How to define the tolerance limits?

Thanks

Raj

1 REPLY 1

Former Member
0 Kudos

Raj,

Where some answers:

1)What are the possible changes required for device info record(billing specific)?how it works?

DIR should be create has master data records and only change exploradicatly. Within the Installations you might have to change from a DIR confirguration to another.

2)Do we configure static notes for the meter reading order? What r the notes in real time scenario?

YES, see examples:

Estimated consumption

Real consumption

Parcial Estimated consumption

Migrated consumption...

3)How to Scheduled mass maeter reading order jobs in the back grouond? What is the TCode for each

job? Transaction EL09 - Mass MRO creation.

4)Do we monitor these jobs in SM37? for Utility also? what r the different possible variants?

Yes, SM37 is used also in IS-U.

SLG0 - Application logs.

EMMA - BPEM - EMMA Cases.

5)How to upload the periodic meter readings? What are issues we face in realtime?

By Idocs or Manually. If it's done by Idoc's, customer validations need to be specified and implemented trought a ABAP development/enhancement. Error Handling is the biggest issue. Define fallback scenarios. Provid Business w/ tools to diagnosticate and solve the errors. Request replacemente Read (rectification) and so on.

6)How to generate report on implausable meter reading results by portions/MR Units/Period)?

It already exits. Program RELEABL3.

7)How and why we need to configure validation process for the meter reading( plausible/implausible) and what would be the values?

8)How to define the tolerance limits?

Kr,

André