Calibration of measuring equipments

Former Member
0 Kudos

Hi, How to maintain the calibration data in SAP using QM Module?Pls mention the t-codes related?

Accepted Solutions (1)

Accepted Solutions (1)

former_member186399
Active Contributor
0 Kudos

Dear Yadav

Config

SPRO> QM>Quality inspection> inspection lot creation> define inspections for plant maintenence. maintain inspection type against any PM order type. use PM05

1) Create equipment using - IE01

2) create task list with inspection point 300 using IA01

3) Create maintenence plan using IP42

4) Do sheduling using IP10

5) Release the order - inspection lot gets generated automaticaly

REgards

gajesh

Answers (1)

Answers (1)

former_member199502
Active Contributor
0 Kudos

Hi,

Please follow the following prcoess flow

You can create a maintenance strategy(IP11) for the calibration of equipment mean to say in what frequency calibaration is carried out either monthly,weekly or yearly.

Assign this strategy to the task list.after that follow the process steps as explained.

Once scheduling is carried out in IP10,according to the strategy maintained in task list,system will generate maintenance calls.for example if calibration is carried out monthly and scheduling is done for the period of 12 months,system will generate 12 maintenance calls.once first call is finished do deadline monitoring(iw38),system will automatically created maintenance order for the second call.

Calibration flow almost follows the preventive maintenance cycle except inspection point is assigned in task list.

Process flow(assuming test equipment and master data created)

IA05- Create General Task list(Enter inspection point :300,operation,inspection charactertics to the operation,usage)

IP01-Create maintenance plan( Use maintenace startegy of plant,enter equipment, select general task list for plan the equipment,enter call horizon,planning cycle schduling period)

IP10-Schedule the plan Schedule the plan for the quantity with frequency defined in the plan.Which schdule the according to the schdule date.Schedule date generates pm order for the plan on due date.

IW33-Display order.

QE51-Calibration result recording for equipment- Gives status for result i.e ok or not ok.

QA11-Lot usage decision

IW41-Confirmation for the order.

Hope it helps