Hi,

We have sap -> XI -> legacy system. Legacy system has only one QA environment. SAP QA has multiple clients. For first cycle of integration testing, the team needs to test from SAP QA client 200. Second cycle, a different SAP client is used. How is this handled in XI? Do we have to create scenarios for all the clients? and have all the QA clients as targets for the Dev client in SLD? or keep changing the target between integration cycles. and refreshing the configuration everytime?

I am sure this is the case with all projects. so please let me know what is the best practice..

thanks

Accepted Solutions (1)

Accepted Solutions (1)

former_member732072
Active Participant
0 Kudos

Hi,

Please have a look at the following link and see if it helps you.

Best Regards

Former Member
0 Kudos

Create number of sender agreement equal to number of client and activate that adapter from which u want to pick the data.

Answers (3)

Answers (3)

former_member181962
Active Contributor
0 Kudos

How about creating three technical systems(One each for one client) and only one business system?

Assign the first technical system to the BS for phase1.

Similarly assign technical system2 to the same BS(Remove the TS1 now) for phase2..and similarly for phase3..

Regards,

Ravi

Former Member
0 Kudos

try using receiver determination using xpath otherwise see enhaced receiver determination

Former Member
0 Kudos

Hi

Normally we keep design part as same and create two different Scenarios for the Clients in ID.

rgds