ATP question

0 Kudos

hello,

I have a sales order and there is no stock. Based on which details the ATP check is carried out

and the new delivery dates are proposed.

Thanks and Regards,

Vimala

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member550050
Active Contributor
0 Kudos

Hi

ATP comes from OVZ9 configuration

In t code OVZ9 we configure for a material what all parameters to be considered for checking availability

That is any Incoming POs are there?

Incoming PRs are there?

Suppose if the stock is 10 and a open sales order is there for 5 units already should the system consider only the balance 5 only for next incoming orders in availabilty checking

This is done by ticking include sales requirements in OVZ9

Like this what all incoming outgoing and physical stocks should be considered in availabilty checking ?

If the stock is zero and there is no incoming stocks like PR's and PO's even then system can confirm stocks for sales orders if the check without RLT time is unticked in OVZ9

If the check without RLT time is unticked in OVZ9 then system checks with RLT time and the RLT time is maintained in MMR that is MRP3 data and if that is blank system assumes at the end of 0 days the stocks are available and hence can confirm schedule lines in sales order and this will hit you only in PGI

If the check without RLT time is ticked in OVZ9 in this example you will get a pop up while creating the sales order the delivery proposal cannot be given and schedule lines will be with confirmed qty as zero

The lead time maintained in VOV8 and the loading time and picktime maintained in shipping pt and the transit time and transportation lead time maintained in Route are considered for delivery scheduling

Regards

Raja

former_member217082
Active Contributor
0 Kudos

Hi Vimala

Based on Shipping point parameters you maintain , Lead time in Days in VOV8 , In house production days and other data considers give the delivery date. But ATP check is carried on the basis of the Availability check and the strategy group you maintain in the MMR

Regards

Srinath