GR processing time in QM

Dear Sir/mam

GR processing time in material master is 3 for eg and inspection lot created in QA32 with start date and end date is same can you let me know the relation how can i corelate this gr time with actual start and end time of inspection.

regards

kunal

Former Member
Former Member replied

Hi Kunal,

Put this GR processing time as 3 at Material master ->QM View>Inspection Set up--->For the relevant inspection type go to the field "Avg. insp. duration" in the details for the inspection type. Put 3 here. System picks the Start Date - End Date of the inspection lot from here.

Regards,

Shyamal