Two BOMS for a Single material

Dear Friends

We have a particular scrap materialn that we want to melt and want to extract Molten metal from it. Thus some 500 grams of scrap will produce 450gm of molten metal and another scrap will be generated thereby by 50 gm.

Thus I need to maintain a BOM and routing for molten metal. The problem is molten metal all ready has got a BOM & routing. Now should I maintain an alternative BOM for the same material? But I donu2019t want the end user to select BOM while confirming production order.

Existing BOM for Molten Metal = 11000036 ( Aluminium Alloy, Grade HS-1(H) Fe:0 .6%)+ SH200001(-)(LPDC CYLINDER HEAD ALUMINIUM DROSS)

Pls Tell me how to maintain alternative BOM where end users dont need to select BOM