Hi Gurus,

My customer has a new revision for a new material.

He needs to replace the existing material with the new one.

It's possible to do it by using a change master record with a validity date.

By doing this MRP would create planned orders with the new material in the bom.

The only problem is related to the existing material inventories. There are plainty of stock in the shop of this material.

SO to avoid the problem is there a way to tell the system to replace the item until depletion stock (stock = 0)

Thanks and regards

Former Member
Former Member replied

Standard solution for this is "Discontinuation". Please check SAP online help:

http://help.sap.com/erp2005_ehp_04/helpdata/EN/ea/e9b3f84c7211d189520000e829fbbd/frameset.htm