on 04-17-2009 7:34 AM
Hi All.
in my sap system(sap ecc6.0). I create a material, and assign the material to a bom. when i use MM02 to change material unit. it is ok. but i check the note 138767. the note display if the material assgin the bom then could't change material's unit.it is sap bug?
thanks!
james
Hi,
This is not a Bug.. This is the restriction in SAP..
Unless you delete the BOM, it is not possible to change the UOM.
If you are using the ECM for BOM then becareful while deleting the BOM..(without History only, delete the same).
Otherwise, the entry in STKO/STPO will not allow you to change the UOM..
Regards,
Siva
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Shiva,
Please refer the note,what he is telling is right.according to this note,if a material is assigne or used in any of the BOM,then u cant change base unit of measure.
-
Within the material master record maintenance, you want to change the base unit of measure (base unit). During the change, the system performs extensive checks in order to avoid inconsistencies in the applications which use the material master.
In particular, the following checks are performed:
The base unit must not be defined as an alternative unit of measure for the material
No International Article Number must be assigned to the base unit
No proportion/product units must be defined for the material
No configurable material must be assigned
The material must not be used as a configurable material
Stock must neither exist for the previous period nor for the current period
No physical inventory must be active
No reservations or dependent requirements must exist for which the deletion indicator is not set
No planned orders must exist
No purchase requisitions, purchase orders or scheduling agreements must exist for which the deletion indicator is not set
No WM transfer requirements, no WM quants or no WM posting change notices must exist
The material must not be a bill of material
The material must not be contained in a bill of material
The material must not be used as a production resource/tool
The material must not be used in task lists
No standard cost estimate must exist for the current or future period
No production orders must exist
No planned independent requirements must exist
No run schedule headers must exist
If the base unit has dimensions, no serial number profile must be assigned
No sales and distribution documents must exist which have status Not processed or Partially processed
-
Hi,
If the material is having any orders or stock, The system can not allow to change the Base unit of measure.
if you want to change the Base unit of measure remove the orders and stocks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.