hi,

I am using MC50 trx to find out the dead stocks in a plant from 15.01.2004 to 15.01.2009.the system list out the materials that are not used for the past 5 years.

Now iam taking some material code from the list which i have obtained from MC50 and checking it in mb51 trx to ensure that no movements happened in the mentioned dates as above.

but the system is showing the material mov 101,601,261,201 ..why it is so ,in what logic the system is considering the dead stocks in plant.

Regards,

velu

I

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

not answered

Former Member
0 Kudos

Hi

Check the dates of material document in MB51. It might be previous dates.

Regards,

Raman

Former Member
0 Kudos

HI,

Thanx for your reply. i have checked as you said, it is showig both the befoe and after dates.

why the after dates are coming.

Regards,

velu

Former Member
0 Kudos

hi,

any body faced the same issue.

Regards,

velu