Skip to Content

Archived discussions are read-only. Learn more about SAP Q&A

Error on run ABAP Reports during ECC6.0 SR3

Hi All,

I am doing installation of ECC6.0 SR3 with oracle 10.0 on Window server 2003. I have installed DEV successfully and now try to install QAS on same machine. i got error on Run ABAP Reports steps.

Logs:

I

NFO 2009-04-13 10:44:34.953
RFC connection information checked successfully.

ERROR 2009-04-13 10:44:35.890
FRF-00007  Unable to open RFC connection.

ERROR 2009-04-13 10:44:35.890
MUT-03025  Caught ERfcExcept in Modulecall: Connect to SAP gateway failed
Connect_PM  GWHOST=devqas, GWSERV=sapgw01, SYSNR=01

ERROR 2009-04-13 10:44:35.890
FCO-00011  The step runRADDBDIF with step key |NW_Onehost|ind|ind|ind|ind|0|0|NW_Onehost_System|ind|ind|ind|ind|2|0|NW_CI_Instance|ind|ind|ind|ind|11|0|NW_CI_Instance_ABAP_Reports|ind|ind|ind|ind|2|0|runRADDBDIF was executed with status ERROR ( Last error reported by the step :Caught ERfcExcept in Modulecall: Connect to SAP gateway failed
Connect_PM  GWHOST=devqas, GWSERV=sapgw01, SYSNR=01

INFO 2009-04-13 10:44:59.187
An error occured and the user decided to retry the current step: "|NW_Onehost|ind|ind|ind|ind|0|0|NW_Onehost_System|ind|ind|ind|ind|2|0|NW_CI_Instance|ind|ind|ind|ind|11|0|NW_CI_Instance_ABAP_Reports|ind|ind|ind|ind|2|0|runRADDBDIF".

INFO 2009-04-13 10:44:59.265
RFC parameter CLIENT set to value 000.

INFO 2009-04-13 10:44:59.265
RFC parameter USER set to value DDIC.

INFO 2009-04-13 10:44:59.265
RFC parameter LCHECK set to value 1.

INFO 2009-04-13 10:44:59.265
RFC parameter PCS set to value 1.

INFO 2009-04-13 10:44:59.265
RFC parameter LANG set to value EN.

INFO 2009-04-13 10:44:59.265
RFC parameter ASHOST set to value devqas.

INFO 2009-04-13 10:44:59.265
RFC parameter SYSNR set to value 01.

INFO 2009-04-13 10:44:59.265
RFC connection information checked successfully.

ERROR 2009-04-13 10:45:00.265
FRF-00007  Unable to open RFC connection.

ERROR 2009-04-13 10:45:00.265
MUT-03025  Caught ERfcExcept in Modulecall: Connect to SAP gateway failed
Connect_PM  GWHOST=devqas, GWSERV=sapgw01, SYSNR=01

ERROR 2009-04-13 10:45:00.265
FCO-00011  The step runRADDBDIF with step key |NW_Onehost|ind|ind|ind|ind|0|0|NW_Onehost_System|ind|ind|ind|ind|2|0|NW_CI_Instance|ind|ind|ind|ind|11|0|NW_CI_Instance_ABAP_Reports|ind|ind|ind|ind|2|0|runRADDBDIF was executed with status ERROR ( Last error reported by the step :Caught ERfcExcept in Modulecall: Connect to SAP gateway failed
Connect_PM  GWHOST=devqas, GWSERV=sapgw01, SYSNR=01

how can i resolve this issue

advance thanks,

Regards,

majamil

Not what you were looking for? View more on this topic or Ask a question