Help On PS-CATS Integration

I have a client requirement on CATS - PS integration as below -

1. I am using work center in project activities and i have employees assigned to work center through HR.

I have assigned the concerned employees to the activities in PS. Now once the employee, who is assigned to the activity perform the work and go in time entry sheet in CATS in CAT2 T code -

A. Then in standard SAP, this person can see all the activities to which his work center is assigned But

I want the person/employee so see only activities to which he is assigned so that he can not book time

agaist the other activities or work performed.

I see that this is not the standard functinality and i have also gone through some of the threads in SDN, which says that we can use the user exit in CAT2 T code which will check for this validation during save of CAT2 T code,once emplyee enter the time.

But i want the employee to see his activity when he is entering into the CAT2 T code so that the additional efforts of entering the time can be saved.

Has anybody worked on this. request to share your experiance.

Thanks

Former Member
replied

Normally it is based on requirement. There are resouce optimum utilization / over load/ underload realted report you can use very well, if you assign the person at workcenter level & control the same via workcneter capacity utilizations. What I have observed that when you are alwalys running short of resouce at that time it better to assign person at workcenter level for it's optimum utilization. If you your resouce requirement is mostly not going to be overloaded in that case you go for the person assignmnet at activity level.

Regards

Nitin P.