cancel
Showing results for 
Search instead for 
Did you mean: 

Import into QA is allowed without Phase Shift

Former Member
0 Kudos

All-

My IT Operator is able to perform an import into QA when the phase is still in Dev w/ release. Shouldn't this throw an error saying it has to be in Test Phase? Where do I control this.

Thanks

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

It doesn't have to be in Test phase. You can import during Development with Release. Test phase just stops you from doing new development, but still test the stuff that was already worked on.

It must be an authorization issue. Does he have the "special" RFC auths?

edit: ah I read isn't able, not is able. same thing applies just ignore the last two senetences.

Former Member
0 Kudos

Well if that is the way it works I am fine with it. Now send me that freakin design doc

Former Member
0 Kudos

I have to send it later. You'd know that if you picked up your phone.

Answers (0)