on 04-03-2006 2:58 PM
I have carried out an init and extracted to BW. In R3 I make a change to a Billing document. After making the changes I run a program RMBWV313 and than try a Delta Load. The change is not coming through. Is there a Safety interval or anything that I need to consider and if so how can I check the value of the safety interval. Thanks
Hi,
there is no safety interval for lo datasources. I guess you made a change that was not delta relevant. Try again for a field that is for sure delta relevant.
regards
Siggi