on 04-06-2009 7:38 AM
Dear All,
Is there any feature provided in SOLMAN with help of that a transported request in Quality server for any change, can be reverted back into DEV server, if the change attached with that request is not found satisfactory. Pls let me know the procedure for reverting back the TR from QLT server to DEV server.(If any)
Regards
Andrew.
Hi,
you need to undo the changes manually in a new TR/TSK.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Andrew,
I think the process you should follow is:
- you made a Chang Request with a related Normal Correction
- after importing the Normal Correction to the TST system an error is discivred
- then create a Testmessage based on the Normal Correction where the original transports belongs.
- follow the same path with the Testmessage as with the Normal Correction to solve the problem
- Then ChaRM will take care of interlinking the Testmessage and the transports created in there to
transport them all within the Maintenance cycle
And indeed, the original transport is released and cannot feedback to the DEV, to the described procedure above solves that problem. Then also you'll stay consistent within your transport landscape.
Rg.
Rutger
Andrew,
Look into RKT Solman, a lot of information is available there.
https://websmp209.sap-ag.de/~form/sapnet?_SHORTKEY=01100035870000633637&;
Regards,
Rutger