cancel
Showing results for 
Search instead for 
Did you mean: 

RFC - Connection - SCM 5.0/ECC 6.0

Former Member
0 Kudos

Dear All..Working on SCM 5.0 & ECC 6.0..

Till yesterday the CIF connection was working Smoothly...

But Today Morning..In APO the strange eroor is appeared in SM12 - "Maximum no. of 100 Connectable SAP Gateway reached"

And in ECC6.0 ..SMq1 - "Error When Opening the RFC Connection"

Plz help me to resolve the same...

Thanking you,

Regards,

Rajesh Patil

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Rajesh Patil,

Please check whether the livecache connection is up for this event. Try to clear the sm12 lock by checking the SAP gateway & RFC settings.

Regards

R. Senthil Mareeswaran.

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi, Rajesh,

set the profile parameter in your SCM box.

gw/gw_disconnect = 0

BR.

SB