cancel
Showing results for 
Search instead for 
Did you mean: 

shipping point

Former Member
0 Kudos

Hi,

A company having 2 different division manufactured goods in one single plant.Having different shipping point according to division wise.

Please give me the customization process for this.

Thanks,

poplu.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

You can define two different divisions and assign them to sale organisation in the path

ImgEnterprise strcture - definitionlogistics general -- define copy delete division

Then assign this to sales org in the path

Img-ESassignmentAssign division to sales org

Then

Define the plant in the path

Img-ES-Definition-Logisitis general-define, copy, delete Plant

Then assign this plant to company under the path

Img-Es-Assignment-logistics general-assign plant to company

Then define the shipping point under the path

IMG-ES-Definition-Logistics exection-shipping point

here yo can define the nmber of shipping points as per yor requirement and then assign them to

plant under the path

Img-ES-Assignment-Logistic Exection- Assign shipping point to plant

Edited by: santosh kumar vemuri on Apr 3, 2009 2:41 PM

Answers (2)

Answers (2)

former_member550050
Active Contributor
0 Kudos

Hi

T code for creating new divisions is OVXB

T code for creating new shippin points is is OVXD

shipping points are assigned to plants in OVXC

shipping point determination in sales order happens thro OVL2 settings

For every thing to happen smooth is you should haveyour enterprise structure defined and assigned perfectly

Regards

Raja

Lakshmipathi
Active Contributor
0 Kudos

Shipping Points are created in OVXD and assigned to plant in OVXC. So accordingly you have to make assignments of shipping point to plant. Besides this, in OVL2, for the combination of

=> Shipping condition from customer master

=> Loading group from material master and

=> Delivering Plant

you have to assign the shipping point

thanks

G. Lakshmipathi