on 04-01-2009 3:17 PM
Hi Friends
Is XI required for integration APO/PP-MRP/PM/PS to SRM-EBP.
Regards
Simha
Hi Simha,
Xi is not required to integrate APO/PP-MRP/PM/PS to SRM-EBP.
We can integrate R/3 , APO systems through RFC , ALE.
Thanks,
Koushik.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
thanks friends
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
I dont think ALE is required.
if the external requirements are comming from Non SAP systems then XI is manditory. if the requirements are comming from R/3 ( Sap -pp/ MRP / Manual PR's ) no need XI, Need to establish a RFC connection between two systems.
following link could be better understand..
http://help.sap.com/saphelp_srm50/helpdata/en/18/8897267ef5eb44beb7fc578e95845e/frameset.htm
To Configure PDP scenarion.. please refer kathir's article.
Hope it could be helpful..
Thanks
prasad.s