Query on PDP landscape?

Former Member
0 Kudos

Hi Friends

Is XI required for integration APO/PP-MRP/PM/PS to SRM-EBP.

Regards

Simha

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Simha,

Xi is not required to integrate APO/PP-MRP/PM/PS to SRM-EBP.

We can integrate R/3 , APO systems through RFC , ALE.

Thanks,

Koushik.

Former Member
0 Kudos

Thanks Koushik

Do u think ALE is mandatory

Regards

Simha

Edited by: simha.n on Apr 1, 2009 5:57 PM

Answers (2)

Answers (2)

Former Member
0 Kudos

thanks friends

Former Member
0 Kudos

Hi,

I dont think ALE is required.

if the external requirements are comming from Non SAP systems then XI is manditory. if the requirements are comming from R/3 ( Sap -pp/ MRP / Manual PR's ) no need XI, Need to establish a RFC connection between two systems.

following link could be better understand..

http://help.sap.com/saphelp_srm50/helpdata/en/18/8897267ef5eb44beb7fc578e95845e/frameset.htm

To Configure PDP scenarion.. please refer kathir's article.

https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/802a11ff-efc9-2b10-ee93-c9c9fbae...

Hope it could be helpful..

Thanks

prasad.s