cancel
Showing results for 
Search instead for 
Did you mean: 

backup by legato

Former Member
0 Kudos

HI Experts,

Could any one tell me how to schedule backup by legato. ( STEP BY STEP)

OS - Windows Server

DB= Oracle 9i

SAP- ECC 6.0

Thanks in Advance.

Sumit

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

Check out following link.

[http://dlc.sun.com/pdf/875-3426-10/875-3426-10.pdf]

Hope this helps.

Manoj Chintawar

Answers (1)

Answers (1)

markus_doehr2
Active Contributor
0 Kudos

there is nothing like "step-by-step" documentation how to set up a backup with Legato.

There are various ways of doing Oracle backups (brtools, RMAN), depending on that you need to have different Legato clients installed.

All those things are nicely covered in the installation guides on http://powerlink.emc.com.

And btw: Oracle 9.2 is out of support already, you should consider upgrading to 10.2.

Markus