Summarised Requirements

Former Member
0 Kudos

Hi gurus,

In Availability process...

In Checking group definition, we need to maintain Sales order requirements.

We have 2 types of requirements i.e Individual requirements and summarized requirements.

Summarized requirements records group together or update several requirements under certain conditions in the material master record (plant, date, procedure, requirement class).

There are two types of summarized requirements records:

1. Summarized requirements records for each day

2. Summarized requirements records for each week

My question is where we maintain in the configuration that for example i want summarised requirement record for each week and based on plant.

Viswanath

Accepted Solutions (1)

Accepted Solutions (1)

Lakshmipathi
Active Contributor
0 Kudos

In OVZ2, you would be maintaining these details against the availability check and the availability check is assigned in material master in "Availability Check" of MRP3 view

thanks

G. Lakshmipathi

Former Member
0 Kudos

Hi Laxmipathi,

In OVZ2 we will maintain whether it is a summarized requirement or an individual requirement. But my question is if I select Summarized requirement, where can i say to system that summarize the requirements for 1 day or 1 week.

Viswanath

Lakshmipathi
Active Contributor
0 Kudos

In the same TCode, you can see a tab "TotDlvReqs". Press F4 here so that you will get the required details.

thanks

G. Lakshmipathi