Hey guys,
Is anybody can explain me the merrit of setting up "doors" in the customizing? I don not really understand their usage.
Thanks in Advance.
Julien
Hi
To optimize the putaway and pick processes in your warehouse, you can define doors and staging areas in a warehouse number. You can also assign the doors to the staging areas as goods receiving and shipping points. The staging area is added to the door in the delivery document if there is no other assignment listed under "Door and Staging Area Determination".
You can also assign different functions, even simultaneously, to a door. These include:
Goods receipts
Goods issues
Cross-docking
Flow through
The system finds the doors and staging areas for the individual deliveries using search criteria that help to optimize the material flow during putaway, cross-docking, and picking.
Hope this answers your query.
Regards
Amol
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI ,
Door are defined to recive & despatch the material.
Its use is you can set the door only for reciving or only for despatch as per your requirement.
& also the part of EWM i.e. cross dock,Direct stock alocation indicator you can set.
Dev
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
This is the location where the goods arrive at or leave the warehouse. It is an organizational unit that is assigned to the warehouse number.
To optimize the put away and pick processes in your warehouse, you can define doors and staging areas in a warehouse number. You can also assign the doors to the staging areas as goods receiving and shipping points. The staging area is added to the door in the delivery document if there is no other assignment listed under "Door and Staging Area Determination".
You can also assign a picked-items zone to a dock door as a default value. This value is assigned to the dock door in the delivery document, provided the "Door and picked-items-zone determination" do not have a different assignment
you can also assign different functions, even simultaneously, to a door.
These include:
Goods receipts
Goods issues
The system finds the doors and staging areas for the individual deliveries using search criteria that help to optimize the material flow during putaway, cross-docking, and picking.
The door is also an integration point with SAP Yard Management. Yard Management is about managing vehicles on the yard (area outside the warehouse). You can assign and move vehicles to specific doors, depending on various settings.
Thanks,
AMIT
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Besides the points mentioned above, the door is also the integration point with SAP Yard Management. Yard Management is about managing vehicles on the yard (area outside the warehouse). You can assign and move vehicles to specific doors, depending on various settings.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
98 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.