on 03-19-2009 5:07 PM
Hi,
We have an issue with a project def (CP104) where the WBS underneath this project def are not aligned with the proj def numbering. Proj Def is CP104 and the WBS are all CL582xxx.
This is causing a problem as it prevents us from saving changes to the WBS.
The CL582 project don't exist.
When we try to do changes following message appear:
Check Required Fields:
u201CThe 5st pos WBS Element includes the Proj.Numberu201D
Do you know the source of this issue and how to close/fix the WBS and Proj Def?
Thanks you
I would post this in the Project System thread. I don't think it is a Sales and Distribution problem
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
This message is a custom message that appear only in CJ20N. I thought that was a standard message.
We can change the project name in CJ02 transaccion, because in this transaction don't appear the validation.
Thank to everybody
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.