on 03-19-2009 1:16 PM
Hi :
I have a material code X for which 2 different type of Sales Order (Say A and B )needs to be created.
For Sales Order Type A the atp check needs to be done in APO through GATP for material code X.
For Sales Order Type B the atp check needs to be done in SAP R/3 ECC 6.0 through availabilty check functionality for same material code X.
It is not possible to create seperate material codes to carry out atp/gatp check seperately in R/3 and in APO.
In real time the atp and cumulative atp position should be same in R/3 and in APO.
Please let me know solution for this issue.
With Regards
Ashish Gupta
Hi Ashish,
Can you share with us as to how you were able to solve this issue. I have a similar issue like yours and I am totally clueless as to what needs to be done..
My scenario goes this way:
I have to modify the Schedule line dates for a GATP material according to a newly created date which I calculate based on the Route Schedule id (VL51, VL52) and display the same in the Sales Order schedule line items.
Also can I get a new set of schedule line dates from the APO system for a date which I calculate based on the Goods Issue date - VALW-AULWE in any exit using a FM or a BAPI?? so that I can get these dates and populate the same in the Sales Order Schedule line??
Thanks in advance,
Susanth
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.