03-18-2009 5:46 PM
Hi Expert's
We are in the process of Implementing ISU-CCS . I want to know Installation, configuration and Maintenance of ISU-CCS. as basis prospective.
Waiting for reply
RAJ
03-19-2009 6:02 AM
Integration
To enable you to control meter reading and billing processes, the following components have been integrated:
Regional structure (ISU-BFRS)
You can store temperature areas and meter reading units for streets and cities in the regional structure. These can then be copied to installations.
Portioning and Scheduling (ISU-BFPS)
In scheduling you define the meter reading dates. These dates are dependent on the meter reading unit to which the installation is allocated.
Rate Structure (ISU-BIBDRS)
The rate, on which the billing of the installation is based, is dependent on the general rate category to which the installation is allocated. You can override the general rate category with the individual rate category of the installation (if you have made specific arrangements with the customer, for example).
Installation Structure (ISU-DMDIIS)
The registers and rate data of devices installed in the installation are maintained in the installation structure.
Regards,
Siva