Hi All
Sorry to ask you this basic question. But to clarify my doubt I put this question here.
What all are the Database Background job I have to schedule in my system and how to track them? I have scheduled all standard jobs in sm36. Is that enough?
ECC 6.0 on Oracle 10.2 is my system.
Regards,
A.K.M
Hi,
You can track the background jobs through SM37.
Kalyan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Arvind,
you need to have following database jobs:
1. Check DB
2. Update statistics
3. Database backup jobs
all standard jobs through SM36 are only SAP jobs which are required to run in the system
Rohit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi arvind,
Additionaly you add 2 more background job from db13
database statistic chek
and dbcheck
Regards,
Nitin Salunkhe
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
87 | |
10 | |
10 | |
10 | |
7 | |
6 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.