cancel
Showing results for 
Search instead for 
Did you mean: 

Life Cycle Assigments not working.

Former Member
0 Kudos

Hi All

we have a peculiar problem with life cycle planning , we use SCM 4.1 Version and since last 2 months our Phase in and Phase out, assigments we assigned in life cycle planning are not getting applied correctly. I checked all the setting and also spool list from the background job. Phase outs which are seen in setting are not getting applied in the job during material level forecast.

Can someone suggest what else to look at.

Thanks

KV

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi

Please check if the Life cycle planning is selected in Forecast profile, check if al your from and to dates are correct. Also check OSS note: 1222953. We applied this when we had a similiar issue and ot worked for us.

Siva

Former Member
0 Kudos

Thanks for your response, we had send a message to SAP and after testing our system they suggested us to appy the same note OSS 1222953. We aplied this today and pushed into Quality system and tested the life cycles are working fine.

KV