on 03-17-2009 1:33 AM
I changed the status of level 1WBS and Project Def to tech complete and then posted costs to the level 1 WBS using t.code FB60. I got a message " cannot post costs to wbs element".
Can you tell me if there is any setting or a different methods to be followed to post the costs??
Hi Arvind,
TECO does not stop you from posting cost. You can post cost even after TECO. Check if some user status is also getting set automatically by setting system status TECO. That user status might be stopping you from posting cost.
Anyway you can alway undo systeem status TECO, and if your settings allow you can change the current user status also that might be stopping you from posting cost.
**check the details of the error and check what status exactly is stopping you.
with regards,
Ravi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
104 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.