Hi,
I would like to know if I define the WBS element to be statistical (statistical ticked in Control tab) and would want to have posting. Do I need to set it as account assignment element? (I noticed system is not allowing me to post if I do not set it as account assignment element). I want to make sure the actual cost would be be posted to the WBS element as the WBS element should just be statistical in nature.
Please also confirm if I always need to specify actual cost center posted if the statistical field is ticked PRPS-KOSTL.
Thanks!
If you want to post actual cost to a WBS element, then that WBS element should be defined as Account assignment element.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Yes, so the account assignment should always be ticked if I want to post actual to STATISTICAL WBS Element. Now I would like to confirm if I always need to specify actual cost center posted if the statistical field is ticked PRPS-KOSTL.
Also, I understand that if I run CJI3, for statistical Actuals posted, its value type will be 11 - Statistical Actual instead of 4 - Actual.
Thanks!
Vivian
i do not hink you can post actual cost value type 4 to a statistical cost element - do check this in you dev system
i would think that you can post to a statisitcal WBS element against a type 90 cost element for which you wilkl need the account assignment tiked and this will be seen as value type 11 in CJI3