planned and actual cost

Former Member
0 Kudos

hi

after doing cat5 the cost must transfer to the ps, in my case the plan/actual% is showing 100% at the activity level, deliberately I enter different time in the time sheet to see the difference in %, but when i enter time difference in wbs level in cat2 and after doing cat7 i can c the difference in actual and planed cost.

my query is i want to see the difference in plan/actual at the activity level or u can say after doing cat5 so any one can help me on this and what setting to b changed.

thanx in advance

subhro

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

thanx

Former Member
0 Kudos

Which report are you looking at?

Former Member
0 Kudos

hi

while seeing act/plan/variance report using t code S_ALR_87013543

subhro