Hello, I am trying to add new value to a purchasing organization in extended attributes about product categories.

When I add new value system throws an error message: "No material group assigned to this value", this material group is created in R/3 backend but not in SRM. How can I transport this value to SRM? Only 3 values not all data about material groups.

Thanks in advance

Rosa Rodríguez

Accepted Solutions (1)

Accepted Solutions (1)

former_member183819
Active Contributor
0 Kudos

Hello Rosa

You can pull via tcode r3ar2 and put this request into R3ar4 and monitor via r3ar3 .

r3ar2 - filter for t023 table for your desired material group.

regards

Muthu

Former Member
0 Kudos

Hello, I have this in the transactions that you mentioned:

r3ar2

Request Name: ESN

Adapter Object: DNL_CUST_PROD1

RequestType: Request: Objects could be loaded from R/3 backend / CRM DB

Use One with mark

Table: T023T

FieldName: MATKL

I/E: I Inlusive defined set/array

Opt: BT

Low and High: range of material groups that I want to replicate.

I put in transaction R3ar4 the request name and when I check on transaction r3ar3 this transaction is running and take long time .... I think there is a problem because are only 3 product categories

What can I do to check if the system failed or something similar?

Thanks

Rosa Rodríguez

former_member183819
Active Contributor
0 Kudos

Hi Rosa

Table: T023 rather that t023t since it is a just text table

regards

Muthu

Former Member
0 Kudos

Hello, I changed the table and appears as running again

Thanks

Rosa

former_member183819
Active Contributor
0 Kudos

Hi

In the meantime , check comm_category table in srm. just you check it out.

still you find difficulty just transfer one category rather than three.

regards

Muthu

Former Member
0 Kudos

I checked COMM_CATEGORY table and it doesn´t exist here. I modified the entrie and put only one material group but it doesn´t work

Thanks

Rosa

former_member183819
Active Contributor
0 Kudos

Hi Rosa,

I am wondering why you did not get it. however You must get it. is there any special character mentioned in the material group text.

regards

Muthu

Former Member
0 Kudos

No, material group is QOX

I don´t understand what happen....

Please can you tell me if we can check by another transaction some errors?

Thanks

Rosa

former_member183819
Active Contributor
0 Kudos

Hi Rosa

SMW01 and SMwp and smq1,smq2 and slg1

check them. you must get some clue.

regards

Muthu

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi

I am also trying the same thing.When I add new value system throws an error message: "No material group assigned to this value", whether it is replicated from r/3 or local product hierarchy which i create manually from T-Code "COMM_HIERARCHY" . still same error exist.

Even when i try to replicate product hierarchy fromm ECC and check a job in Smq1 its says job failed coz of RFC connection but when i check RFC connection in SM59 then it is connected.please let me know what to do ?