Substitution - Level 1 WBS as Billing Element

Former Member
0 Kudos

I want to address the following scenario:

In my project created now onwards (i.e. created date = " " or created date > = "24.02.2009" ) should have only level 1 WBS as billing element.

Even if users are inserting billing element indicator for multiple WBSs while creating project, same will be wiped out for all WBS other then level one in the process.

This validation should not affect project created prior to date defined in validation i.e. created date < 24.02.2009. I have done this with suitable logic

I have defined my substitution for WBS in OPSN.

One of the prerequisites and substitution in step 1 is as under:

Prerequisites:

*

PROJ-VBUKR = 'IN01' AND PROJ-ERDAT = '' AND

PRPS-STUFE = '1'

*

Substitution:

Billing Element X

There are more steps also.

My substitution is perfectly working while change project i.e. if you open project to insert billing element indicator, on saving it will wipe out billing element indicator for all WBS other then level 1.

However, above substitution is not working in first instant i.e. while creating the project i.e. when I am creating project first time and inserting Billing element indicator for WBS other then level 1. Project are getting created with multiple level WBS.

I would request to explain why my substitution is not functioning for Created date = " " 9 i.e. Created date is blank). When you are creating project first time, you will not have created date and hence this field will be blank. How to apply this logic ?

Thanks and bets regards

Bharat

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

hi

include the Transcation code CJ01 or CJ02 or CJ20N also in the prerequisite.

Former Member
0 Kudos

I found an alternative solution

Closed

regards

Bharat