i make sales order with material x and quantity 1 when i make avilability check i didn't get confirmed quantity at the requested delivery date although there's 100 pc from material x in storage location.

the system propose delivery date after requseted delivery date by 9 days

i checked the configuration of shipping point and make

pick time from 1 to 0

loading time from 1 to 0

when i make sales order with same material and the same quantity of above sales order. the system propose delivery date after requested delivery date by 7 days

the RLT is not activated on checking scope

can any one tell me from where dose the system get the appended 7 days?

thanks in advance.

Accepted Solutions (1)

Accepted Solutions (1)

Lakshmipathi
Active Contributor
0 Kudos

Check in VOV8 whether any value is maintained for the field Lead time in days. Then check in your material master MRP2 view for the two fields In-house production and GR Processing Time

thanks

G. Lakshmipathi

Former Member
0 Kudos

thanks Lakshmipathi your answer solve my problem.

and thanks all for your efforts but i have a comment on the answer of checking lead time in sales document type

lead time in sales document type to retrive required delivery date.

Regards;

Mohammad mansour

Edited by: mohammad mansour on Feb 24, 2009 3:54 PM

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi,

Please check the lead time in days field in Tcode VOV8 for your order type. It must be & days. Make it blank

Your problem will solve.

Regards,

Abhee.

Former Member
0 Kudos

Hi,

Check In VOV8 the lead time defined for delivery, and check the factory calendar settings

Former Member
0 Kudos

Hi mohammad,

I think below link will be useful for you in order to find solution.

http://help.sap.com/printdocu/core/Print46c/en/data/pdf/SDBFAC/SDBFAC.pdf

Gothrough it,

Thanks,

Swamy H P