on 02-19-2009 3:47 PM
Hi
Auto ud for 03 inspection
what i did for auto UD - whenever inspectionlot TECO,then autoUD job
will carried out
In inprocess inspection -one of the required characteristic rejected
and notification created & not closed and process order TECO'ed.
but the
automatic UD job scheduled- this is closing the inpection lot as
acepted..
How to restrict if any one of MIC failure - Auto UD should not close
the inspection lot(lot status should not UD)
Why 03 inpsection auto UD acepted the lot ? is this std.SAP
if any one of required MIC is failure then Automatic UD will not
close that lot.
is't std behaviour of SAP?
please throw somelights?
Thanks
Sami
close
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Sami,
1) yes you are right In QA41 UD will be given irrespective of whether the mic is rejected or you have defect recording. But QA16 will give UD to only those lot which are accepted.
2) UD of 03 inspection doesnt have any relevance. It will not hamper anhy process niether it will block an further process.
But it gets relevance if you have these
a) RR is mandatory in PP for the order type setting in Tcode OPK4 in config
SPRO > Production> Shop floor control> confirmation> define confirmation parameters
Maintain Results Rec. (QM)- Error message if no Insp results exist.
and if bymistakely if you give the UD for the lot RR cannot be done so it will block CO11N confirmation
b) You can have setting which will connect 03 & 04 inspection. withoout 03 inspection UD given 04 cannot be completed.
Regards
gajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Sami
please go for QA16. it is trouble free. it will allow UD for only those lot which will have mic accepted. it will not allow UD for rejected lots
Regards
gajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Keerthi/Gajesh
I already did in QA41 -background job Auto UD
1. what is the difference between qa41 and QA16(schedule background) - means if i schedule QA16 background -it will close only inspection lot which doesn't have any MIC failure and/or defect record/ quality notification?
please correct me if i am wrong.
2. one more question - for inprocess inspection what is the importance of UD(produced Material is not batch managed)
if i didn't make UD -system wise what are the impacts or pros/cons?
can you please throw some lights.
Thanks
Sami
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.