Hi,

is there any place where we can maintain scheduled date of technical closure of the project?

Thanks!

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Thanks you everyone!

Former Member
0 Kudos

Hi

You can do the scheduling of the project as per your requirement. But if you want to set status of the project as "CLSD- Closed" then you have to do it via the system status or user status of the respective WBS. Then no account posting can be done in that WBS.

Regds

Uddhab

Former Member
0 Kudos

You can maintain it in User Field Tab in Date fields.

Sudhir

virendra_pal
Active Contributor
0 Kudos

do you mean as documents

then use DMS

Former Member
0 Kudos

no i meant date not document.

virendra_pal
Active Contributor
0 Kudos

use user defined field as suggested