Hi Experts,

We loaded Project definitions, WBS element and netwroks with activities into a new client. Activities have estimates too. When we loaded the estimates went into COSP table as it is a plan data.

We did some mistake during the load so we have to delete the whole load(Project definitions, WBS, networks and activities). Now, when we are doing the load again, system is giving error saying entries exist in COSP table. What we found is even though we deleted networks and activities the planned cost are not deleted from COSP table. I tried KP90 and KP91 but it didn't work. How can i delete the estimates from COSP table, Since we are bringing the same network numbers from legacy.

Thanks,

Satya

Accepted Solutions (0)

Answers (1)

Answers (1)

virendra_pal
Active Contributor
0 Kudos

wrie an ABAP program to clean the COSP table