Dear Gurus,
i have to carry out stability study for a new material which come for trial.
please guide the steps
thanks in advance
kailash thakkar
Hi Mahesh,
In the SAP Library, it is well explained on stability study, read the documentation to understand the concept & procedure.
I am giving some basic things for your quick understanding.
1. Define the Storage Conditions & Primary Pacckaging in QM customization & maintain the numbber ranges for stability study maitenance plans in Plant Maintenance (PM) customization
2. Craete your Maintenance Strategy & corresponding maintenance packages (Consult with your Plant Maintenance Experts (IP11))
3. Craete Separate inspection plans for different storage conditins (QP01)
4. Assign the Maintenance Strategy to the Header of the above inspection plans using Engineering Work Bench (CWBQM)
5. Assign the corresponding maintenance packages to the operations of the above inspection plans using Engineering Work Bench (CWBQM)
6. Create the stabilty study (QST01 or QM01) & follow the user friendly steps given in the transaction.
7. Change Stability study using QM02
8. Schedule the maintenance plan of the stability study with IP30 (Consult with your Plant Maintenance Experts )
Please note that the above steps are given only to give the basic idea to start activity. You will come across lot of isseus which may need QM & PM expertise.
With Best Regards,
Vithal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Kailash,
For stability studie are irrelavant with inventory stocks. Only thing is, you need to create batch number for the material in your plant. You can carryout stability studies even if the stocks are not available in any stock type.
You can receive the material in inventory stocks, then consume against QC cost center or you can keep in the reseve stock. Coordinate with your MM/FI experts for the valuation of the material you recieved.
With Best Regards,
Vithal
Yes Kailash,
To do stability study first you have to create Material Master for such material.
"You can conduct stability studies for many different types of self-produced or externally procured materials or products, regardless of your industry sector." So if it is externally produced and procured material then you create as ROH or if it self-produced you create as HALB or FERT.
Thanks!!!
User | Count |
---|---|
97 | |
10 | |
9 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.