on 02-09-2009 7:16 AM
after doing GR inspection lot creater is of STATUS --CRTD CHCR SPRQ.
1). i checked all the master data and also inspection plan exist with valid from date 02.02.2009.
2). Proper usage maintained as per the inspection type
3) inspection lot key date-04.02.2009.
4) In the inspection setup view in MM , Automatic assignment , check Chars, insp with task list is ticked.
i try to assign task list manually, its giving message task list not found.
please advice...
regards
hi all ,
i checked all the above...nothing is working.
let me clear - insp with material specification is not tick in material master.
i ticked post to insp. stock,inspection with task list,automatic assignment, check chars.
when i click on insp/plan in inspection lot....says-No inspection plan could be found.
now i cancel that lot and creating a new PO and new GR new Q-info recor d and acitvating the same.
now status is CRTD CHCR SPRQ IRCH and there are two task list.and same material assigned double time to each task list.
what gone wrong?
regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Please confirm that the 2 tasklist for the same material have different validity date or have different From to Lot size entry, or one is marked for deletion.
This excercise is to ensure that unique tasklist can be identified once the Inspection Lot is created.Can you try to delete one task list from this assignment and see if the system picks up the required Task List.
Please update.
Thanks,
RKM.
Hi Sawy,
No the scene is.....
You have your material assigned to TWO different task list, one of them is marked for Deletion, and having the lot size corresponding to the lot size of inspection lot.
Now the task list that is not marked for deletion, is ti having the corresponding From --- To lot size to the inspection lot? If it doesn't then it will surely show this error.
e.g.
If the From to Lot Size for the task list is 1 to 999999999
And inspection lot's lot size is 0.98, then the task list will not work for this lot.
Pls check and revert.
Regards,
Shyamal
Today after 11 years I had the same problem and I was trying to cancel somehow this and even this thread was of not resolving my issue.
What I did is first I checked in IM with MMBE then the MB5B to get the material document.
Took the MIGO and Cancellation of material document so as to reprocess the goods receipt with correct configuration by removing double inspections for the material. Noting this for any ones use in future if it may relavent.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear pp sawy,
Pls try this.
1. Check the tasklist exist using QP03 and look into usage defined?
2. Using QA03, Enter inspection lot-->select Insp. specifications tab->check usage is same like defined in Task list.
3. Enter correct usage.
4. Now assign the specification & sample size manually.
You will find the lot released now.
VRMP.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Also check whether more than one Inspection plan available for the material.
Regards
Hemanth
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi, Sewy
Yes Check what Gajesh is asking to,,,,apart from that...........
Check.........
- The lot size of the inspection lot must fall within the range of From to Lot Size for the inspection plan.
- Material must be assigned to the lot.
- The status of inspection plan must be released.
Regards,
Shyamal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello friend ,
Check the usage in Insp plan and in QA23 select lot > click insp lot> then check date > specify today's one>click on insp specification .lets see whether it is taking the respective data or not if it take > go to sample tab > click calculate sample > save it .. Status will change to REL ..
with regards Ajay
Hello
Just checking whether tick in insp with material specification is not tick right
Regards
gajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.