on 02-05-2009 6:40 PM
Hi Gurus,
Basis guys are changing the R/3 system, now PI (QA) has to point to new R/3 system.
1) How can we do this changes in XI to point to R/3? Do we have to configure the interfaces individually to point to new R/3??
2) What are the consequences and settings that needs to be done from both R/3 and XI point of view?
Regards,
Preeti
I think even design also would affect.Because,We might have imported IDOCS from R3 system by giving client and R3 system parameters.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Preeti,
Just make sure all the RFC Destinations, Partner Profiles etc.., are in place for the new system and also, you need to make changes in the Configurations.
Regards,
Hari.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Pavan,
>Do we have to configure the interfaces individually to point to new R/3??
NO , Use the QA connection Parameters
>What are the consequences and settings that needs to be done from both R/3 and XI point of view?
Check the RFC Destination, Port,Partner Profile, Meta Data,Connection User ID & Passwords
Cheers
Agasthuri Doss
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
90 | |
10 | |
10 | |
10 | |
7 | |
7 | |
6 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.