on 02-04-2009 4:38 AM
Hello ,
Issue decription:
The system calculating delivery=loading date , though the route is maintained for 9 days trasit days.
This problem is with only one routeA.
When i have created SO for material M123 with route "B" shipping Point 0001, the system consider transit duration of the route.But when Sales order (SO )is placed for materail M123, shipping Point 0001, and route A, system is not considering the transit duration.
Kindly let me know any config change is required with respect to route or forwarding agent.
Hi,
Check for the route A what's the transit duration time has maintained.The system uses the transit time from delivery scheduling as well as other time estimates (for example, the loading time) to determine the dates by which the goods must be available for picking, packing, and loading.Finally check the factory calendar if forwarding agent facory calendar has not maintaained it will consider the shipping point calendar.
Regards,
Hari Challa.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
ans
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
8 | |
7 | |
4 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.