on 01-29-2009 12:51 AM
Hi!
Does any one has good or bad experiences doing an ORACLE reorganization to an ORACLE DB in a Metrocluster environment?
The database in question has 1,5Tb, oracle 10g.
I also would like to know the size of metrocluster link and if it is in synchronous or asynchronous mode.
Cheers
Generally there is no difference doing the reorg in a Metrocluster environnement.
But the disk replication (continouus access link) is slowing down your disk writes. This can be a problem, but you might consider to suspend the link during the reorg time anyway. Gives you more speed, and a backup if something goes wrong.
We are running several large ERP systems on HP-UX, ServiceGuard with Metrocluster with Hitachi XP disks.
I experienced bigger performance issues on the older XP 1024, but the throughput has greatly improved since we upgraded to a XP 24000 lately. All our links are synchronous, as far as i know, that is what a Metrocluster is. I am not sure about the technical layout of the link, but we used to have 4 paths of 2gb fiber in one direction (maybe they were upgraded to 4gb in the mean time). The links are 12-24 km in distance.
Regards, Michael
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
We only have 100Mbts. When you have a very high load in one system it will affect the others, in this special case database reorganization will take more time.
Anyway our customer will upgrade the link but not even close to the bandwidth you have.
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
93 | |
11 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.