At my present client they are doing cost planning out of SAP for 12 months in a fiscal year. They are getting a dump in excel. I need to upload the excel file for Cost Planning in SAP.
The option I have came across is using CJR2 for loading the excel in SAP. I have the option available of Excel planning upload. But I am not able to select the file, if I chose this option. I guess it should be a txt file. But even after doing that the system asks for a file description.
Also I read somewhere around this that I need to maintain a planner profile, which should have the respective layout of Excel for uploading.
Please let me know, if anybody has worked arou
Answered
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
I was able to proceed ahead using Excel upload. However I am looking to plan it over a span of 12 months. Now the layout which I have used was 1-701. This layout doesnt allow me to plan for a period of 12 months. I am able to plan against CE and WBS for a period of 12 months and load it. But not able to find a way to plan it for 12 months. The main reason being I am unable to find a layout in Planning Cost Element/Activity inputs with 12 months provision.
Please let me know if someone has came across the same problem.
Thanks
Sarang
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
7 | |
7 | |
4 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.