Engineering BOM

Hello Gurus,

We are planning to use Engineering BOM (Usage 2) during prototyping stage and then copy Engineering BOM to Production BOM (Usage 1) during manufacturing. I wanted to know would MRP and Cost Roll Up work with Engineering BOM. What configurations do I have to do in MRP to make MRP, Bom Explosion and Cost Roll Up work on Engineering BOM (Usage 2)

Thanks in advance,

Sachin